Kraken Funded

Get funded.
Keep 80% of the gains.

Pass a challenge and unlock a funded account with up to $10,000.
Floating cryptocurrency coins representing a funded trading account

Available on

Kraken

What is Kraken Funded?

Kraken Funded is a skill-based challenge. Choose a tier, hit the 12% gain target without breaching the 3% floor, and unlock an account with up to $10,000. No commissions on trades. No daily loss limit. Keep 80% of the gains.

How Kraken Funded works

Pick your tier

Start at the $1K, $5K, or $10K tier. Challenge fees start at $20 (non-refundable). Choose the tier that matches your goals.
Trading challenge tier selection showing a $10,000 funded account

Hit the target

Reach the 12% target with no time limit, across 50+ crypto assets and stocks with different order types. Just keep clear of the 3% floor.
Trading challenge screen showing progress toward the profit target

Get funded

Pass and unlock an account with up to $10,000. Same assets, same rules. Keep 80% of the gains. Withdraw in USD.
Funded trading account showing profit and available withdrawal amount

Simple rules. Clear costs.

One fee to enter, no commissions on trades, no daily loss limit, and you keep 80% of the gains.
Profit summary showing an available withdrawal from a funded trading account

Keep 80% of the gains

Pass the challenge and 80% of every dollar you gain in the funded account is yours. Payouts are in USD, sent straight to your Kraken account. No cap on how much you can withdraw over time.

Illustrative example. Passing a challenge isn’t guaranteed, and only some clients receive a payout.

No daily loss limits

Most funded challenges end if you dip too far in a single day. Kraken Funded doesn’t. There’s one 3% overall floor, measured against your starting balance. Manage your risk your way.
Trading challenge progress chart with a five percent loss floor

No commissions on any trade

The one-time challenge fee is non-refundable and it’s what gets you in. From there you pay no commissions in the challenge or the funded account, just the spread built into each trade.
Trade summary showing no trading fees on a funded account

Ready to prove your skill?

Start from $20. No commitment beyond the challenge fee.

Available in the Kraken app. Scan to download.

Start your challenge

FAQs

Kraken Funded is a skill-based challenge. Pay a one-time challenge fee, pass the challenge, and unlock a funded account with up to $10,000. Keep 80% of the gains, and withdraw once you pass the minimum amount of $20 in gains.

One fee per challenge: $20 for the $1K plan, $50 for $5K, or $90 for $10K. The fee is non-refundable.

Beyond that there are no commissions during the challenge or in the funded account, and no withdrawal fees. The only other cost is the spread, the small difference between the buy and sell price, which is built into each trade in both the challenge and the funded account.

Grow the starting balance by 12%. On the $1K plan, that means reaching $1,120. There’s no time limit and no minimum number of positions. The challenge ends the moment you hit the target.

The only money you risk is the challenge fee. Your main Kraken balance stays untouched. This isn’t borrowing. There’s no loan, no interest, and your personal assets are never at risk. Your downside is capped at the fee, and there’s no cap on how much you can withdraw over time. The fee is non-refundable.

The challenge ends if the balance drops more than 3% from the starting balance. You lose nothing beyond the challenge fee since the challenge balance was never your own money. You can start a new challenge at any tier whenever you’re ready.

Withdraw gains from the funded account any time. Sell any open positions back to USD first and make withdrawals in USD. 80% of the gains transfers to your main Kraken account; Kraken keeps 20%. Most withdrawals arrive within 24 hours. Gains you’ve already withdrawn are yours to keep, even if the funded account later closes.

Kraken Funded supports 50+ major cryptocurrencies and select stocks (availability varies by region), including Bitcoin, Ethereum, and other actively traded assets. The list is more curated than what’s available across your Kraken account. You’ll see exactly which assets are available inside the Kraken Funded tab.

It’s been built so buying and selling feels exactly like trading anywhere else on Kraken. The asset list may vary slightly by region due to local availability rules.

Completely. Nothing you do inside Kraken Funded affects your main balance. The challenge balance sits inside the Funded tab. The only things that touch your main account are the challenge fee and gain withdrawals. Kraken Funded is operated by Payward Oceanic Ltd. (BVI).

Important Disclosures
Important Disclosures about Breakout Trading Group LLC ("Breakout"), Payward Oceanic Ltd. ("POL") and the Funded-Trader Program. This product may be accessed through the Kraken user interface but it is not a regulated product and is offered by Breakout and POL.

Evaluation Program
Breakout’s evaluation program is intentionally rigorous and designed to verify a trader’s risk-management skill and strategy discipline before any proprietary capital is allocated. Most applicants do not pass on their first attempt and there is no guarantee that your performance will improve or that you will pass any future evaluations. Prospective traders should purchase an evaluation only if they are confident in their trading ability and accept the risk of not qualifying for a funded account. Evaluation fees are non-refundable for each attempt once trading begins, regardless of outcome.

Funded-Trader Terms
If you pass the evaluation phase and become a funded trader ("FT") with POL, all market-facing transactions, if any, are carried out exclusively by POL, for POL’s own principal account and at its sole discretion. POL has discretion to determine which order type (A or B-book) it will apply. FTs do not own any trading account or position, and hold no beneficial or proprietary interest in POL’s accounts, assets or trades. When an FT submits a trade idea, POL may, in its absolute discretion, either (i) record the idea as an internal, administrative book entry and calculate a hypothetical result without routing any order externally, or (ii) accept the idea for POL’s proprietary book and route the transaction to a market maker or exchange. FTs have no control over, or visibility into, the method POL selects.

Conflicts of Interest
When a funded trader’s balance hits the max-loss line, POL is released from any liability to pay future performance fees — so POL’s financial interest is opposite to yours. POL may receive financial incentives from third parties based on trade ideas provided by FTs. Any such revenue is retained solely by POL and is not shared with FTs. Because such financial incentives are not included in PnL for FTs, conflicts of interest may exist between POL and each FT. FTs should carefully consider these conflicts before participating. In addition, because Breakout earns fees each time an evaluation trader fails and then re-purchases an evaluation, conflicts of interest may also exist between Breakout and each evaluation trader.

This service is not regulated by the FCA. Kraken Funded provides a platform interface through which you can connect to an evaluation service. The evaluation is managed by Breakout Trading Group, LLC ("Breakout"). If you pass, you can choose to become an independent contractor and provide trade signals to Payward Oceanic Ltd. (BVI). Kraken acts solely as the platform interface — Kraken does not itself operate the evaluation, make execution decisions, hold funds, or guarantee any payout. If you pass the evaluation, you are providing trade signals to Payward Oceanic Ltd — you are not trading on your own behalf. Payward Oceanic exercises sole discretion over whether to act on your signals. Any payout is a discretionary performance fee, not a return on investment. Most applicants do not pass on their first attempt and there is no guarantee that your performance will improve or that you will pass any future evaluations. Prospective applicants should purchase an evaluation only if they are confident in their ability and knowingly accept the risk of not qualifying for a funded account. Evaluation fees are non-refundable for each attempt once trading begins, regardless of outcome.

Prove your skill. Get funded.

Pass a challenge. Get funded. Keep 80%.

Available in the Kraken app. Scan to download.

Continue in app
Hand holding a phone displaying a funded trading account dashboard